Nu | Titulu | Deskrisaun | Periodu Hahu | Periodu Remata | Status | Asaun |
---|---|---|---|---|---|---|
56 | ADDENDUM No. 1 Design, Supply, Civil Works, Installations, Commissioning, Testing Of 40 MVA X3 = 120 MVA Transformer (Engineering Procurement And Construction (EPC)) At Comoro Substation Dili, Timor-Leste (OCB/0066/EDTL-EP-2024) |
Dili, 07 June 2024 This Addendum No. 1 is issued to amend certain
items in the Bidding Document for above cited contract in accordance with ITC 8
of the Bidding Document.
Design, Supply, Civil Works, Installations, Commissioning,
Testing Of 40 MVA X3 = 120 MVA Transformer (Engineering Procurement And Construction (EPC)) At Comoro Substation
Dili, Timor-Leste (OCB/0066/EDTL-EP-2024) |
07/Jun/2024 | Download | ||
57 | INTENT TO AWARD 7 June 2024 Supply Transformer 400 KVA Urgently – SSS -00117-EDTL-EP-2024 |
Díli, 07 June 2024
In Accordance with article 96, of Decree Law
22/2022 of the Procurement Legal Regime, the Eletricidade the Timor-Leste,
Empresa Pública (EDTL,E.P.) would like to announce its intent to award the
following contract. |
07/Jun/2024 | 14/Jun/2024 | Expiradu | Download |
58 | INTENT TO AWARD 6 June 2024 Renting Infrastructure Facilities (CBM, Floating Hose, Pipeline) To Hera Power Plant for Supply of Light Fuel For Lot1 During 3 Years (2024,2024 and 2026) SSS-0085-EDTL-EP-2024 |
Díli, 06 June
2024
In Accordance with article 96, of Decree Law 22/2022 of the Procurement Legal Regime, the Eletricidade the Timor-Leste, Empresa Pública (EDTL,E.P.) would like to announce its intent to award the following contract. |
06/Jun/2024 | 14/Jun/2024 | Expiradu | Download |
59 | AMENDA NO. 2 FORNESEMENTU MOBILIÁRIU MAI EDTL,E.P. (RFQ/0088/EDTLEP-2024) |
Díli, 06 Juñu 2024
Amenda No.2 neʾe fó sai hodi responde ba
mudansa neʾebé maka iha instrusaun ba listante seksaun I no.8 (d) iha
dokumentus konkursu hanesan tuir mai neʾe: |
06/Jun/2024 | 10/Jun/2024 | Expiradu | Download |
60 | AMENDA No.1 FORNESEMENTU MOBILIÁRIO MAI EDTL,E.P. ( RFQ/0088/EDTL-EP-2024) |
Díli, 04 Juñu 2024
Amenda No.1 neʾe fó
sai hodi responde ba mudansa neʾebé
maka iha instrusaun ba listante seksaun I no.8 (d) iha dokumentus konkursu
hanesan tuir mai neʾe: |
04/Jun/2024 | 05/Jun/2024 | Expiradu | Download |